The overhang to the next strip should be 3 8 inch.
Nail pattern for roofing felt.
Put fasteners at least every 8 inches.
The paper should then be nailed in or stapled every three to four inches across.
Rafter or roof truss to top plate table and section 2308 7 5 3 10 common 316d box 410d box 43 x0 131 nails 4 3 14 gage staples 7 16 crown toenail c 7.
Check at several points to make sure the overhang is consistent.
Where a roll ends and a new one is begun the two rolls should be overlapped by four inches.
Pay careful attention to roll the felt out smoothly avoiding wrinkles as you move across the roof.
Anchor the top corner of the felt after it has been properly positioned and roll the felt out across the roof.
The wsu should overhang the drip edge by 1 2 inch so snap a line that is 35 1 2 inches above the drip edge.
It does not have to be perfect but you may need to realign the drip edge.
Snap a chalkline to help you align the wsu or felt.
Roll out about 10 feet of felt and fasten with staples or roofing nails with plastic washer heads.
Bsd 321 handout fastening schedule.
All nails and staples should be placed on the lower half of the paper.
Contact roofhelp 12 24 nailing pattern for roofing felt each row of nails that are 24 on center should be approximately 12 from the outside edge of the roll.
The top edge of the felt should be nailed no less than every eight inches.