Installing inside corner.
Nails for siding starter strip.
8d hot galvanized spiral these grip rite 2 1 2 in.
Then cut and nail the first course of siding along the layout line.
Partly drive a nail 11 2 in.
These nails feature a spiral design.
Insulation for vinyl siding 1.
This should be nailed every 6 inches with it s lower edge running along the chalk line.
Hold a tape measure against the exterior wall and travel.
These grip rite 2 1 2 in.
To fasten the siding use galvanized nails sized to penetrate at least 11 2 into the studs.
How to install a vinyl siding starter strip step 1.
Down from the top edge.
Whether the substrate is plywood sheathing or foam insulation most manufacturers require the siding to be fastened into the studs.
Most manufacturers produce a starter strip that secures the bottom course of siding to the sheathing and holds it at the proper angle.
Locate the lowest possible corner that has sheathing.
Find the lowest corner of the old siding or sheathing on the house.
Gap at the end and nail at each stud with a single 8d galvanized box nail held 1 in.
8d hot galvanized spiral siding nails 1 lb pack are hot galvanized for durability and are ideal for fastening your siding project.
Measure a spot that is 1 1 2 inches above the bottom edge of the sheathing at this lowest point using a tape.